|
Structural Draftsman/Checker |
|
ON SHORE: |
|
|
Contract: |
12 months, renewable |
|
Start |
ASAP |
|
Project: |
ERSAI |
|
Location: |
Kuryk
Base (Kazakhstan, 70 Km from Aktau City) |
|
Salary: |
USD 2460 Monthly Consolidated (net, free of tax from
the country of work) |
|
Overtime rate: |
USD 14.80/hour (from the 8th hour from Monday to
Saturday and on Sunday) |
|
Start date: |
|
|
Working days: |
6 days a week, Monday to Saturday |
|
Working hours: |
8 hours per day, 208 monthly |
|
Accommodation: |
Free accommodation and full boarding provided in
line with Companys standard. |
|
Rotation: |
90/21 (21 unpaid vacation leave) |
|
Medical Insurance: |
As per Companys standard |
|
Insurance D&D/Life |
As per Companys standard |
|
Air fare: |
Economy ticket at the beginning, end of project and for each
work leaves rotation cycle. |
|
Notes: |
Employment certificates (Employees with Bachelor
for the latest 5 years of experience. Employees
Without Bachelor for the latest 7 years of
experience). |
Job Description:
 |
|
|
Senior Piping Supervisor |
|
ON SHORE: |
|
|
Contract: |
12 months, renewable |
|
Start |
ASAP |
|
Project: |
ERSAI |
|
Location: |
Kuryk
Base (Kazakhstan, 70 Km from Aktau City) |
|
Salary: |
USD 2460 Monthly Consolidated (net, free of tax from
the country of work) |
|
Overtime rate: |
USD 14.80/hour (from the 8th hour from Monday to
Saturday and on Sunday) |
|
Start date: |
|
|
Working days: |
6 days a week, Monday to Saturday |
|
Working hours: |
8 hours per day, 208 monthly |
|
Accommodation: |
Free accommodation and full boarding provided in
line with Companys standard. |
|
Rotation: |
90/21 (21 unpaid vacation leave) |
|
Medical Insurance: |
As per Companys standard |
|
Insurance D&D/Life |
As per Companys standard |
|
Air fare: |
Economy ticket at the beginning, end of project and for each
work leaves rotation cycle. |
|
Notes: |
Employment certificates (Employees with Bachelor
for the latest 5 years of experience. Employees
Without Bachelor for the latest 7 years of
experience). |
Job Description:
 |
|
| |
|
|
OFF SHORE: |
|
|
Contract: |
12 months, renewable |
|
Start |
ASAP |
|
Project: |
ERSAI |
|
Location: |
Kuryk
Base (Kazakhstan, 70 Km from Aktau City) |
|
Salary: |
USD 4500 Monthly Consolidated (net, free of tax from the
country of work) |
|
Overtime rate: |
USD 18.80 hourly (from the 12th hour from Monday to
Sunday) |
|
Start date: |
ASAP |
|
Working days: |
7 days a week, from Monday to Sunday
|
|
Working hours: |
12 hours/day, 360 monthly |
|
Accommodation: |
Free accommodation and full boarding provided in
line with Companys standard. |
|
Rotation: |
90/30 (30 days unpaid vacation leave) |
|
Medical Insurance: |
As per Companys standard |
|
Insurance D&D/Life |
As per Companys standard |
|
Air fare: |
Economy ticket at the beginning, end of project and for each
work leaves rotation cycle. |
|
Notes: |
Employment certificates (Employees with Bachelor for
the latest 5 years of experience. Employees
Without Bachelor for the latest 7 years of
experience). |
Job Description:
 |
|
| |
|
|
Production Engineer & Piping Engineer |
|
Contract: |
12 months |
|
Start |
ASAP (URGENT) |
|
Project: |
HUC
Atyrau D-Island (Kazakhstan) |
|
Location: |
Kazakhstan |
|
Start date: |
ASAP
|
|
Working days: |
7 days per week |
|
Working hours: |
12 hours per day |
|
Rotation: |
90/30 |
|
Medical Insurance: |
Basic
|
|
Insurance D&D/Life |
USD 100000
/ USD 30000 |
| |
|
|
Sr. Material Coordinator & Material
Coordinator
|
|
Contract: |
1 year |
|
Project: |
HUC
Atyrau D-Island (Kazakhstan) |
|
Location: |
Kazakhstan |
|
Start date: |
ASAP
(URGENT) |
|
Working days: |
7 days per week |
|
Working hours: |
12 hours per day |
|
Rotation: |
90/30 |
|
Medical Insurance: |
Basic
|
|
Insurance D&D/Life |
USD 100000
/ USD 30000 |
| |
|
|
Notes: Candidate
must have between 7 15 years experience. |
|
Millwright Mechanic &
Foreman Millwright |
|
Contract: |
12 months |
|
Project: |
HUC
Atyrau D-Island (Kazakhstan) |
|
Location: |
Kazakhstan |
|
Start date: |
ASAP
|
|
Working days: |
7 days per week |
|
Working hours: |
12 hours per day |
|
Rotation: |
165/30 |
|
Accommodation: |
Provided
(shared) |
|
Medical Insurance: |
Basic
|
|
Death & Disability Insurance:
|
100000 USD
|
| |
|
|
Notes: Candidate
must have between 5 10 years experience. |
| |
|
Structural Foreman &
Pipe Fitter
Foreman |
|
Contract: |
12
months |
|
Project: |
HUC
Atyrau D-Island (Kazakhstan) |
|
Location: |
Kazakhstan |
|
Start date: |
ASAP
(URGENT) |
|
Working days: |
7 days per week |
|
Working hours: |
12 hours per day |
|
Rotation: |
165/30 |
|
Accommodation: |
Provided
(shared) |
|
Medical Insurance: |
Basic
|
|
Insurance D&D/Life:
|
100000 USD
|
| |
|
|
Notes: Candidate
must have between 7 15 years experience. |
|
Qualification required
(kindly consider
these as compulsory):
Millwrights
Millwrights are usually responsible for the
unassembled equipment when it arrives at the job
site. Using hoisting and moving equipment, they
position the pieces that need to be assembled. Their
job requires a thorough knowledge of the load
bearing capabilities of the equipment they use as
well as an understanding of blueprints and technical
instructions.
Millwrights must be able to read blueprints and
schematic drawings to determine work procedures, to
construct foundations for and to assemble, dismantle
and overhaul machinery and equipment, using hand and
power tools and to direct workers engaged in such
endeavors. The use of lathes, milling machines and
grinders may be required to make customized parts or
repairs. In the course of work, millwrights are
required to move, assemble and install machinery and
equipment such as shafting, precision bearings, gear
boxes, motors, mechanical clutches, conveyors, and
tram rails, using hoists, pulleys, dollies, rollers,
and trucks. Millwrights are also involved in routine
tasks, such as lubrication of machinery, bearing
replacement, seal replacement, cleaning of parts
during an overhaul and preventive maintenance.
Millwrights also must have a good understanding of
fluid mechanics (hydraulics
and
pneumatics), and all of the
components involved in these processes, such as
valves, cylinders,
pumps and
compressors.
Modern standards of practice for millwrights also
require working within precise limits or standards
of accuracy, at heights without fear; the use of
logical step-by-step procedures in work; planning,
solving problems and decision-making based on
quantifiable information.
Millwrights are trained to work with a wide array of
precision tools, such as vernier calipers,
micrometers, dial indicators, levels, gauge blocks,
and optical and laser alignment tooling.
=================================================================================
PIPE FITTER & PIPE FITTER FOREMAN
|
MISSION: |
|
|
Performs operations within the frame of his
responsibilities and as directed by his
superior. |
|
|
Carries out marking, pre-fabrication and
assembly activities for carbon steel, alloy
steel and stainless piping, assisted by
other functions. |
|
|
top activities if required on safety grounds
if to continue could cause any damage or
injury. |
| |
|
|
TASKS: |
|
|
To become familiar with the mechanical
equipment in relation to his job. |
|
|
To operate the tools and equipment during
constructions operations and ensures
adequate attention to perform the job as
directed by his superior. |
|
|
Receives drawings, materials lists and
instructions. |
|
|
Inspects drawings and report any mistakes. |
|
|
Checks that materials comply with
specifications and report any missing
materials in order to complete the job. |
|
|
Completes pre-fabrication, assemble piping
and report any anomalies or interference to
his superior. |
|
|
Pre-fabricates and assembles the piping.
Prepare equipment for hydraulic testing. |
|
|
Divides materials for use during
pre-fabrication and use during assembly, cut
down and assemble piping during
pre-fabrication. |
|
|
To ensure that the equipment used for the
job is safe for use, in a good state of
maintenance and provided with the required
protections. |
|
|
To keep the work areas tidy and clean. |
|
|
Perform emergency duties as may be directed. |
| |
|
|
EXPERIENCE: |
|
Expert Level |
|
|
Experience at least of five (5) years
experience in piping activity. |
| |
|
|
Moreover as act as PIPE FITTER FOREMAN. |
|
|
Supervise activities and lead the pipe
fitter team. |
|
|
Checks the work carried out by other pipe
operators, upon the superiors request
ensuring total compliance with quality and
safety procedures and standards. |
|
|
Provide Tool Box Talks (TBT) and JSA as
required by the nature of the job. |
|
|
Ensure the preparation of the tools to
perform the activity. |
| |
|
|
EXPERIENCE: |
|
Senior Level: |
|
|
Experience at least of three (3) years
experience as Pipe Fitter |
|

Interested
applicants are invited to submit detailed resume (CV) stating
personal particulars, employment history, qualifications in English
to the following e-mail address :
dina@totaldata.co.id
in
MS Word not more than 300kb.
Kindly write
"your position code" on your application title and email subject.
Application with PDF or other format and exceeding more than 300KB
will not be considered.
For more info's, please call us
PT. Totaldata Persada
Jln. Raya Jatikramat No. 8 Jatimakmur Pondok Gede Bekasi 17421
Telp. 021-8477689, 021-84994728. Attn.: Ms. Dina
Last updated:
December 1, 2010